NewsFlash

The final MIATA guidelines have been published in Immunity on June 26, 2012. Please check this website and publication for the ready-to-use guidelines.

MIATA Module 3, Version 1.0 PDF Print E-mail

 

Proposal for Module 3 of MIATA Version 1.0 ((based on Consensus workshop and comments from the public consultation period)

Purpose: Reporting framework for publications of human immune monitoring T cell studies  

 

Module 3: Data acquisition

 

Proposal for Version 1.0, Submodule 3A: Equipment and Software  

Required to report:

  • Description of equipment and software versions used for data acquisition

Optional:

  • Investigators might want to provide information on the routine QC procedure(s) whenever it enables better understanding of the experiment.

Excluded:

  • Information on instrument validation will be covered in Module 5 (Lab environment)
  • Information on setup of the equipment and operator training

Version 0: Module 3B: Controls Applied

 

Proposal for Version 1.0, Submodule 3B: Control Applied 

General:  Rename Sub-module: Acquisition strategy

Required to report:

  • Display of representative raw data (e.g. FACS plots or ELISpot photos) including negative control and positive response example

Optional:

  • Investigators might want provide a more detailed explanation on their gating strategy whenever it enables better understanding of the experiment. In case an uncommon strategy was applied comment on why the specific strategy was chosen.
  • Investigators might want to provide information on instrument settings, method and reagents applied for compensation whenever it enables better understanding of the experiment. 
  • A statement should be given about the review process of raw data for data consistency and plausibility.

General comment: The reporting of representative data sets was also discussed in module 4. It was decided to leave this requirement in module 3.

 

Proposal for Version 1.0, Submodule 3C: Quality Assurance  

Required to report: Nothing

 

General: This sub-module should be removed. The auditing option is being addressed in sub-module 3B. All other QA aspects are covered in module 5.

 

The following colleagues participated in the revision of Module 3 during the Webinar on Monday, May 17th 2010.

Michael Kalos, Simone Joosten, Sacha Gnjatic, Lisa Butterfield, Evelyna Derhovanessian, Jill O’Donnell Tormey, Jianda Juan, Guido Ferrari, Sjoerd van der Burg, Cecile Gouttefangeas, Kunle Odunsi, Cedrik Britten and Sylvia Janetzki

 
miataproject.org, Powered by Joomla! and designed by SiteGround Joomla Templates